Stop waiting days for a full charge. We engineer and install safe, dedicated 240V Level 2 charging stations for all electric vehicle makes and models across Los Angeles.
Tesla, Rivian, Ford, Chevy
Engineered to NEC code
LADBS & SCE Compliant
Utility Rebate Paperwork
Buying an Electric Vehicle in Southern California is an exciting step towards efficiency, but relying on the standard 120-volt "Level 1" charger that comes with the car is incredibly frustrating. Adding only 3 to 5 miles of range per hour means your car might not be ready for your morning commute.
Upgrading to a dedicated 240-volt Level 2 charging station allows you to charge your vehicle up to 10 times faster giving you a full battery overnight. However, this massive increase in power draw requires precise, professional electrical engineering.
Many handymen offer cheap EV installations by simply adding a NEMA 14-50 "dryer plug" to your garage without pulling permits or checking your main panel's capacity. This is highly dangerous.
An EV pulls a continuous, heavy electrical load for 8+ hours. Standard dryer receptacles are designed for intermittent use. Repeatedly plugging and unplugging a heavy EV cord wears out the cheap contacts, creating high resistance that leads to melting and severe electrical fires. We install heavy-duty, commercial-grade receptacles or hardwire the station directly, ensuring your home stays safe while delivering maximum charging speeds.
We are highly experienced in hardwiring Tesla Wall Connectors, running dedicated 60-amp circuits to deliver the maximum 48 amps of continuous charging power.
Driving a Rivian, Mach-E, or Ioniq? We install top-rated universal chargers like ChargePoint, JuiceBox, and Wallbox, completely tailored to your vehicle's exact requirements.
If your parking is far from your main panel, we perform code-compliant underground trenching, running thick-gauge wire in rigid conduit to deliver safe power to your driveway or carport.
We design and install multi-unit charging pedestals for apartment complexes, office buildings, and commercial fleets, including dynamic load management systems.
Local utility companies like LADWP and Southern California Edison (SCE) offer fantastic rebates (often hundreds of dollars) to cover the cost of your Level 2 charger installation. However, there is a catch.
To qualify for these rebates, the installation must be performed by a state-licensed C-10 electrician, and a final city permit must be signed off. Furthermore, we perform a mandatory NEC Load Calculation (see below) before starting. If your current electrical panel cannot handle the extra 50 amps, the city inspector will fail the job. We handle all the math, the permits, and the paperwork so your upgrade is fully legal and rebate-ready.
The most common question we get is, "Can my house handle an EV charger?" The answer depends on your existing service. If your home still has an older 100-amp panel, running your Central AC, electric oven, and an EV charger at the same time will trip your main breaker instantly.
If a load calculation shows your panel is maxed out, we have two solutions: We can perform a full 200-Amp Panel Upgrade to future-proof your home, or, if budget is a concern, we can install a Smart Load Management Module (like a DCC-9). This clever device temporarily pauses your EV charger when your home's total power usage spikes, allowing you to install a charger without replacing the entire panel.
Contact us for a load calculation and code-compliant EV charger installation.
(213) 329-0130Serving Greater Los Angeles